Large Containment Vessel Under Construction at Power Plant
Harriman, TN
This impoundment, built over an inherently unstable karstic limestone formation, collapsed into the sinkholes that formed below it, allowing the toxic residue being pumped into the container to simply drain out and into the Clinch River.
Thanks so much to Southwings for flight support!